Past Event

Talk On Factors To Be Considered During Design And Construction Stage For Urban Subway In Densely Populated Area – Case Study For Seoul Metro Subway
Venue: Wisma IEM, 03- CSETD Lecture Room, 2nd Floor, 04- TUSTD Lecture Room, 2nd Floor
Date & Time: 27 Feb 2018 (5:30 PM - 7:30 PM)
CPD: 2
Closing Date Before: 24-Feb-2018 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling & Underground Space AND WTC 2020 Organizing Committee

SYNOPSIS

The Seoul Metro-Subway No.00 is 1.56km long and runs through under densely populated area e.g. high-rise buildings, underpass structure, underground utilities and the trunk road (8~10 lanes). Etc., hence shield TBM method was adopted. At design stage, to mitigate civil complaints, ground settlement and third party damage, various schemes were come up with as regards ground improvement, operational scheme of TBM and mucking /disposal method of slurry, etc. In particular, to minimize the settlement or damage of the building and underpass structures, stability analysis was carried out and ground improvement techniques were adopted at design stage. In order to secure passenger safety, fire safety measures were applied, e.g. escape tunnel and cross passage. However, during construction due to malfunction of TBM and inefficient grouting from inside TBM, hence water draw-down/soil erosion, the undetected existing cavities were enlarged, causing ground loss and damage to the near-by structures. By applying grout method from the ground surface, the damaged part was satisfactorily reinstated and the whole project was successfully completed. The lessons from this project stress the importance of geological investigation, detection of underground features, efficiency in grouting techniques, and constant instrument monitoring during design and/or construction of tunnel under the densely populated area.

The talk will cover :
- The outline of Seoul-Metro subway No.00.
- The construction method of tunnel (Shield TBM)
- Overall operation scheme of TBM (Fabrication, Launching, Dismantling scheme)
- Considerations for safety of tunnel & third parties (e.g. geotechnical investigation, detection of underground utilities and cavities, stability analyses, ground improvement method, instrumentation and monitoring)


BIODATA OF SPEAKERS

Mr. Lee, Jae Hoon obtained, in 1973, his Bachelor of Science degree in civil engineering from Seoul National University in Korea. After graduation, he worked with engineering/consulting firms for approx. 7 years for design of foundations and structures for power plants and chemical/petrochemical plants in Korea. From 1982 through early 1992, he joined contractors for construction of various infrastructures e.g., structural foundations, bridges, tunnels, slope protection works and roads in Saudi Arabia, Hong Kong and Korea. After obtaining a certified professional license in geotechnical engineering in 1992, he joined again engineering/consulting firms in Korea, in charge of geotechnical/tunnel engineering for railway, subway and HSR projects. He obtained his master degree in geotechnical engineering from Seoul National University in 1995. He is currently vice president of Dongil Engineering Consultants in Korea, and taking part in the reference design (RDC 04) of MyHSR project as a team leader of geotechnical/tunnel engineering for Ranhill - Korean consortium.


Additional Information
Posted on
 
 
Talk On Factors To Be Considered During Design And Construction Stage For Urban Subway In Densely Populated Area – Case Study For Seoul Metro Subway
Flyer

13-Feb-2018
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us