Download Details


Details of ARAHAN KETUA PENGARAH BIL.2/2012
Updated on: 24-Feb-2014
Title: ARAHAN KETUA PENGARAH BIL.2/2012
Description: KETETAPAN TEKNIKAL DIALOG BERSAMA JBPM - BADAN PROFESSIONAL (IFEM, IEM, ACEM, PAM & SIRIM)
Download Details:
Download Link: Download
File Size 243K
Total Downloads: 3256

Comment

the distance of hose reel to hose reel shall not limited to 30m(point to point) but must sufficient numbers of hose reels on each floor to ensure that every part of the premise can be reached by a length of not more than 30meter of hose reel tubing.

From MR. LIM THAN SOON
on 08-Jun-2016 12:32:49 AM

Page 1 of 1 (1 items)
Prev
[1]
Next

Comment Area

Please login to add your comment, click here to login
 

Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us