Past Event

Webinar on IEM M&E Conditions of Contract
Venue: Digital Platform
Date & Time: 30 Nov 2021 (4:00 PM - 6:00 PM) Closed
CPD: 2
Closing Date Before: 27-Nov-2021 (Subject to change based on availability of seat)
Organised By Sub-Committee on Engineering Contracts

SYNOPSIS

IEM Conditions of Contract for Mechanical & Electrical Works was first published in 1994. With the publication of the IEM Conditions of Contract for Civil Engineering Works in 2011, the Institution feels that it is necessary to revise the conditions of contract for mechanical and electrical engineering works as well. This task was entrusted to the Sub-Committee on Engineering Contracts.

IEM Form of Contract for Mechanical & Electrical Engineering Works (as it how been renamed), or IEM.ME2012 in short, is a complete departure from its predecessor. Being part of the IEM suite of Conditions of Contract, the conditions has been harmonized with the Conditions of Contract for Civil Engineering Works adopting the same approach in the drafting. An opportunity has been taken to also take into consideration new developments.

The Seminar will provide an opportunity for potential users to familiarize with this form of contract. The speaker will highlight the particular provisions related to mechanical and electrical works. He will also elaborate on the meaning of shop drawings and bills of quantities which are often misinterpreted in the context of M&E works.


BIODATA OF SPEAKER

Ir Wong See Foong graduated with a degree in Mechanical Engineering from the University of Malaya in 1974 and has been in the engineering consultancy practice over the past 45 years. He is a Fellow of the Institution of Engineers Malaysia and a professional engineer with Practicing Certificate registered with the Board of Engineers, Malaysia.

Ir Wong is a Pass President of the Association of Consulting Engineers, Malaysia (ACEM) as well as a Past President of the Institution of Fire Engineers, (U.K.), Malaysia Branch.(IFEM). He was the chairman of the original committee for drafting the IEM Conditions of Contract for Mechanical and Electrical Works (IEM.ME 1/94) and has continued with his contribution to the present revised IEM Conditions of Contract (IEM. ME2012).



Limited to 370 participants only (first come basis) and confirmation email will be sent for successful registration latest by 09 November 2021 @ 5.00 PM


Additional Information
Posted on
 
 
Webinar on IEM M&E Conditions of Contract
Flyer

05-Nov-2021
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
ENGINEERING TECHNOLOGIST GRADUATE 18.87 14.15
ENGINEERING TECHNICIAN GRADUATE 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us