Past Event

WEBINAR - Talk on "From Cradle to the Grave; Project Management of Long Lead Equipment"
Venue: Digital Platform
Date & Time: 10 Dec 2020 (3:00 PM - 5:00 PM) Closed
CPD: 2
Closing Date Before: 07-Dec-2020 (Subject to change based on availability of seat)
Organised By Technical Division - Project Management

SYNOPSIS

One of the most challenging tasks in project management is handling the long lead equipment, which usually falls under the critical path of overall project schedule. Any delays and changes may have a big impact towards the overall project execution which includes cost, quality and schedule. Therefore, it is very critical to have the right competency and knowledge to handle such packages, starting from drafting the technical specification, procurement, detailed design, testing, installation, commissioning and handing over to the operation team. The webinar is intended to share the perspective as a package engineer in terms of handling the challenges faced during the project execution at various phases of the project. The long lead equipment is deemed critical; it may become another sub-project within the main project by itself, which warrants to have its own “project manager” to lead it.


OBJECTIVE

- Identify the typical project management journey in procuring long-lead mechanical packages
- Appraise the expertise and competencies required in order to become an all-rounder package engineer
- Analyse the associated risks in managing the long lead equipment and how to mitigate the risks
- Explore the best practices within the industry


WHO SHOULD ATTEND?

- Project Engineer
- Discipline Engineer (Mechanical, Electrical, Instrument, Process)
- Procurement Executive / Buyer
- Design Consultant
- Construction / Commissioning Engineer


BIODATA OF SPEAKER

Ir. Dr. Harris obtained his Degree of Mechanical Engineering from Universiti Teknologi Malaysia in 2003 and obtained his Doctor of Philosophy from the same university in 2018. He started his career in oil and gas as maintenance rotating engineer for the national oil company downstream utilities plant prior to joining upstream development division, where he became the lead engineer for various turbomachinery and major rotating equipment packages for 3 greenfield projects and 1 brownfield project. Currently entering his 16th year in oil and gas industry, he had the privilege of serving the Malaysia Petroleum Management (MPM) prior joining Centre of Operational Excellence (COE) where he was entrusted to lead the digital solutions related to rotating equipment for upstream business.



Limited to 470 participants only (first come basis) and confirmation email will be sent for successful registration latest by 09 December 2020 @ 5.00 PM


Additional Information
Posted on
 
 
WEBINAR - Talk on "From Cradle to the Grave; Project Management of Long Lead Equipment"
Flyer

15-Oct-2020
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us