Past Event

Physical Half Day Workshop on“Design and Construction Supervision of Bored Tunneling Projects”
Venue: Wisma IEM
Date & Time: 15 Nov 2022 (9:00 AM - 1:30 PM) Closed
CPD: 3.5
Closing Date Before: 12-Nov-2022 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

In this workshop, the participants will learn about the design principles of bored tunnel segmental lining, ground settlement assessment due to bored tunneling and basic principles of segmental lining bored tunneling construction with Earth Pressure Balance Machine (EPBM) and Slurry Shield tunnel boring machine(Slurry TBM), as well as pipe jacking micro tunnel boring machine. With this understanding, the participants will next learn about the various Key Performance Indicator (KPI) for the safe bore tunneling process using bored tunnel machine (TBM). KPI for bored tunneling is important to ensure that the tunneling is safe and does not have adverse impact to the adjacent ground and buildings. The participants will learn about the sequence of work for bored tunneling from construction of TBM shaft, erection of reaction frame, temporary rings, initial drive and main drive. This will equip the participant the necessary basic knowledge in design and construction supervision of bore tunneling works. It is very important to have a comprehensive and clear framework to ensure bored tunnelling underground projects are being carried out in a safe manner and well managed. This worshop will illustrate a good and practical framework for design submission approval, construction supervision and management for bored tunnelling works. This workshop will use some case histories to illustrate some of the more commonly encountered regulation frameworks to be complied with.


SYNOPSIS

Er David Ng is a Professional Engineer (Civil) and Specialist Professional Engineer (Geotechnical) in Singapore. He has been involved in publication of more than 70 technical papers in the field of geotechnical and environmental engineering. He has more than 20 years of experience in management, planning, design and construction of major infrastructure and transportation projects in Singapore, Malaysia and India. Er David Ng is Co-Founder & Executive Director of One Smart Engineering Pte Ltd which has offices and operations in Singapore, Malaysia and India. Some of the major underground infrastructure projects he has been involved in are Singapore MRT projects in North East Line, Downtown Line (DTL), Thomson East Coast line (TEL), Rail Transit System (RTS) connecting Singapore Woodland and Malaysia Johor Bahru, Singapore Underground Expressway projects Kallang Paya Lebar Expressway and North South Corridor, Malaysia KVMRT projects, LRT projects and India Mumbai Metro Line 3 project. Er David Ng is currently Council Member and Hon Secretary of IES and Chairman of Civil & Structural Technical Committee of IES.


Note:
•  Limited to 100 Seats Only. ‘First-Come-First-Registration Basis’


Additional Information
Posted on
 
 
Physical Half Day Workshop on“Design and Construction Supervision of Bored Tunneling Projects”
Flyer

19-Aug-2022
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 300.00 250.00
HONORARY FELLOW 300.00 250.00
FELLOW 300.00 250.00
DISTINGUISHED MEMBER 300.00 250.00
SENIOR MEMBER 300.00 250.00
MEMBER 300.00 250.00
HONORARY MEMBER 300.00 250.00
SENIOR GRADUATE 180.00 150.00
GRADUATE 180.00 150.00
INCORPORATED MEMBER 180.00 150.00
AFFILIATE 180.00 150.00
ASSOCIATE MEMBER 180.00 150.00
ENGINEERING TECHNOLOGIST GRADUATE 180.00 150.00
ENGINEERING TECHNICIAN GRADUATE 180.00 150.00
STUDENT 100.00 80.00
Non IEM Member 500.00 400.00

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us