Physical Half Day Workshop on“Design and Construction Supervision of Bored Tunneling Projects”
Venue:
|
Wisma IEM
|
Date & Time:
|
15 Nov 2022 (9:00 AM - 1:30 PM)
Closed
|
CPD: |
3.5 |
Closing Date Before: |
12-Nov-2022 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Tunneling and Underground Space Engineering (TUSTD) |
SYNOPSIS
In this workshop, the participants will learn about the design principles of bored tunnel segmental lining, ground settlement assessment due to bored tunneling and basic principles of segmental lining bored tunneling construction with Earth Pressure Balance Machine (EPBM) and Slurry Shield tunnel boring machine(Slurry TBM), as well as pipe jacking micro tunnel boring machine. With this understanding, the participants will next learn about the various Key Performance Indicator (KPI) for the safe bore tunneling process using bored tunnel machine (TBM). KPI for bored tunneling is important to ensure that the tunneling is safe and does not have adverse impact to the adjacent ground and buildings. The participants will learn about the sequence of work for bored tunneling from construction of TBM shaft, erection of reaction frame, temporary rings, initial drive and main drive. This will equip the participant the necessary basic knowledge in design and construction supervision of bore tunneling works. It is very important to have a comprehensive and clear framework to ensure bored tunnelling underground projects are being carried out in a safe manner and well managed. This worshop will illustrate a good and practical framework for design submission approval, construction supervision and management for bored tunnelling works. This workshop will use some case histories to illustrate some of the more commonly encountered regulation frameworks to be complied with.
SYNOPSIS
Er David Ng is a Professional Engineer (Civil) and Specialist Professional Engineer (Geotechnical) in Singapore. He has been involved in publication of more than 70 technical papers in the field of geotechnical and environmental engineering. He has more than 20 years of experience in management, planning, design and construction of major infrastructure and transportation projects in Singapore, Malaysia and India. Er David Ng is Co-Founder & Executive Director of One Smart Engineering Pte Ltd which has offices and operations in Singapore, Malaysia and India. Some of the major underground infrastructure projects he has been involved in are Singapore MRT projects in North East Line, Downtown Line (DTL), Thomson East Coast line (TEL), Rail Transit System (RTS) connecting Singapore Woodland and Malaysia Johor Bahru, Singapore Underground Expressway projects Kallang Paya Lebar Expressway and North South Corridor, Malaysia KVMRT projects, LRT projects and India Mumbai Metro Line 3 project. Er David Ng is currently Council Member and Hon Secretary of IES and Chairman of Civil & Structural Technical Committee of IES.
Note: • Limited to 100 Seats Only. ‘First-Come-First-Registration Basis’
|
|