Technical Visit to SapuraKencana HL Fabrication Yard
Venue:
|
SapuraKencana HL Fabrication Yard, Lumut Port Industrial Park, Sitiawan, Perak Darul Ridzuan
|
Date & Time:
|
24 Sep 2016 (6:00 AM - 12:30 PM)
Postponed
|
CPD: |
2.5 |
Closing Date Before: |
21-Sep-2016 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Oil, Gas and Mining |
BACKGROUND
The Company was incorporated in 1982 as HL Engineering Sdn. Bhd., before joining the Kencana Petroleum Berhad group in 2005 and changed its name to Kencana HL Sdn. Bhd. Later in 2013, merger of businesses between SapuraCrest Petroluem Group and Kencana Petroleum Group and changed its name to SapuraKencana HL Fabrication Yard. The yard is capable of producing offshore structures (inclusive of Central Processing Platforms, Wellhead Platforms, Compression Modules, etc.) , Process Modules for FPSO, MOPU and Onshore Processing Facilities (LNG Process Modules, Pipe Racks, etc.).
The 273-acre SapuraKencana Fabrication Yard in Lumut, Perak, strategically located 3km off the Straits of Malacca allowing easy access to both the Indian Ocean and the South China Sea. The yard is equipped with a fully integrated computerized yard management system that links its engineering, planning, quality management, procurement, warehouse and component production centre together. It also leverages on state-of-the-art data tracking tools for error-free tracking of documents, all of which ensure optimal efficiency during mass production of components. Some of the key award and milestone recognitions for SapuraKencana HL Sdn Bhd:
1.5 million manhours without lost time injury ("LTI") for the CPOC Phase 3 Development Project 800,000 manhours without LTI, Celebration of Manifold Fabrication Site Safety Day for the Shell Prelude Project 600,000 manhours without LTI (QHSE) for the Angsi Project 1.5 million manhours without LTI for the EPCIC of RWHP 500,000 manhours without LTI for the EPCC Tukau Baronia 15.0 million manhours without LTI for the Wheatstone Project ISBL LNG Plant 500,000 manhours without LTI for the Apache Julimar Project 600,000 manhours without LTI for the Ichthys Project
|
|