IEM
DELAY IN DELIVERY OF THE MAY 2012 ISSUE OF JURUTERA
updated on 18-May-2012
WE APOLOGISE FOR THE DELAY IN DELIVERY OF THE MAY 2012 ISSUE OF JURUTERA DUE TO UNFORESEEN CIRCUMSTANCES.


Instructions for Preparing Manuscripts
updated on 10-May-2012



Presidential Address 2012
updated on 09-May-2012
Presidential Address 2012 - Vision 100K


Revised IEM Log Book Training Scheme Guidelines
updated on 30-Apr-2012
Graduate Engineers applying to undergo the practical training in the IEM Engineers Log are required to take note of the new guidelines with effect from 1 June 2012.


One-day IEM-CIE-HKIE Tripartite Seminar
updated on 24-Apr-2012
The IEM-CIE-HKIE Tripartite Seminar is aimed to create a venue for interactive discussions and sharing of experience in multi-discipline engineering among The Institution of Engineers, Malaysia (IEM), Chinese Institute of Engineers (CIE, Taiwan) and Hong Kong Institution of Engineers (HKIE).


Membership Renewal Notice 2012
updated on 02-May-2012
Annual Subscription Online Payment via Maybank2u, RHB Now, Visa / Master credit card



IEM
Hiking Trail to Gunung Nuang (Gunung Nuang , Negeri Sembilan, Pahang)
20 May 2012 (07:30:00 AM - 15:00:00 PM)
more details

Talk on The Role of 21st Century Engineers in Sustainable Development (Wisma IEM)
21 May 2012 (17:30:00 PM - 19:30:00 PM)
more details

Applications of River Water Quality Modeling in Malaysia (Wisma IEM)
22 May 2012 (17:30:00 PM - 19:30:00 PM)
more details

Half Day Seminar on Building Designs in Hot & Humid Climates (Wisma IEM)
24 May 2012 (09:00:00 AM - 14:00:00 PM)
more details

2-Day Seminar on Welding Codes and Standards for Engineering Applications (Wisma IEM)
Cancelled
23 May 2012 to 24 May 2012 (09:00:00 AM - 17:30:00 PM)

Talk on Conventional and Renewable Power Generation (Wisma IEM)
25 May 2012 (17:30:00 PM - 19:30:00 PM)
more details

Talk on Implementation of Performance Based Design For Offshore Structures in Blast Design Due to Hydrocarbon Explosion (Wisma IEM)
26 May 2012 (09:00:00 AM - 11:00:00 AM)
more details

Professional Interview Workshop (Wisma IEM)
26 May 2012 (09:30:00 AM - 12:00:00 PM)
more details

Inaugural Meeting of the Marine Engineering and Naval Architecture Technical Division, IEM (Wisma IEM)
26 May 2012 (11:00:00 AM - 13:00:00 PM)
more details

One Day Seminar Earthquake Provisions & Safeguards For M&E Systems In A Building (Wisma IEM)
28 May 2012 (09:00:00 AM - 17:30:00 PM)
more details


Click here to advertise your banner.

IEM

ONLINE SURVEY



NEWSLETTER

Sign up for our newsletter to receive more information
Name:
 

Email Address:
   


Publication

Journal Guidelines
Download here

Referees for Vetting of IEM Publications

The Standing Committee on Publications is revising the list of referees to assist in the vetting of articles received from members and non-members. The referees should preferably be at least Corporate Members of The Institution or graduates with higher degrees. The aim of appointing the referee is to ensure and maintain a standard in the IEM Publications namely the bulletin and the Journal.

IEM's coffee-table book "Engineering Heritage of Malaysia" - Soliciting for Photographs
Download here

Review criteria of IEM Journal
Download here

Bulletin Guidelines
Download here

Submissions for IEM Bulletin Write-up
Download form here

Guidelines for Submission of Articles (Word Document 25KB)

JURUTERA Feedback Form (Word Document 33KB)

IEM Library

  • NEW! Books in IEM Library (Year 2009 March). Download here
  • Books in IEM Library (Year 2007). Download here

For further information, please contact IEM Library at 03-79684012.

Thomas Telford Books
Please click here to visit Thomas Telford, a subsidiary of ICE.

IEM Publisher

  • Jurutera - Rate Card
  • Directory - Rate Card
  • Dimension

 

Sub Section of Publication

back to top ^