Talk on "Technical Feasibility Study of Biomass Power Plants in Malaysia”
Venue: Wisma IEM, 03- CSETD Lecture Room, 2nd Floor, 04- TUSTD Lecture Room, 2nd Floor
Date & Time: 06 Sep 2016 (5:30 PM - 7:30 PM)
CPD: 2
Closing Date Before: 03-Sep-2016 (Subject to change based on availability of seat)
Organised By Technical Division - Mechanical Engineering (METD)

SYNOPSIS

Malaysia is one of the largest palm oil producers and exporters in the world, which producing approximately 19.96 million tonnes of palm oil in 2015.  Up-to 2015, there is total 5.64 million hectares (56,400 km2) of palm oil plantation in Malaysia, which is equivalent to about 78 times total land area of Singapore. As a consequence, average 104 million tonnes of Fresh Fruit Bunches (FFB) had been harvested, which is generating approximately 21 million tonnes of palm waste, which named as Empty Fruit Bunches. (EFB) This large amount of biomass waste (which is EFB) had a great potential to be converted into renewable energy, by burning the EFB in waste-fuel boilers and convert the steam to power via steam turbines.

The promotion of energy diversification is one of the important policy of Malaysian government. Originally, Malaysia’s energy policy focused on four (4) element fuels, which is oil, gas, coal & hydro. In 2001, Malaysia had announced Five Fuel Diversification Strategy, with renewable energy fuels as the fifth (5th) component. Subsequently in 2011, the new renewable energy (RE) policy and act had been established to further strengthen the government’s initiative to boost the renewable energy ecosystem in Malaysia. This policy/act was intended to transform Malaysia to become a nation that is able to satisfy its own energy needs from indigenous RE resources, be independent from fuel imports, and become a leader in green technology development.

In conjunction with this, several biomass power plant projects using the palm waste EFB as main fuel had been initiated by private sectors in Malaysia. However, most of these projects do not meet the objectives due to the unforeseen challenges and difficulties throughout the implementation stage. In fact, setting up of a typical palm based biomass power plant requires thorough feasibility study and customized designs, in order to suit different needs and constraints. The main objective of this two (2) hours talk is to share and discuss on the key factors that need to be considered in order to ensure the feasibility of the biomass power plant project. Key technical issues such as the plant sizing, heat mass balance, fuel availability analysis and also the lessons learned shall be further discussed in this talk.  


BIODATA OF SPEAKER

Ir. CW Chia is a certified Professional Engineer by the Board of Engineers Malaysia (BEM) and also a corporate member with the Institution of Engineers Malaysia. (IEM) He graduated from University of Malaya (UM) with Bachelor of Degree in Mechanical Engineering.

Ir. Chia has more than ten (10) years of experience working in the renewable energy sector of Malaysia, focusing on areas of engineering, consultancy and project management of palm waste biomass power plants. Currently, he is running his own project management and engineering firm, covering the agriculture, energy and construction industry in South East Asia region.


Additional Information
Posted on
 
 
Talk on "Technical Feasibility Study of Biomass Power Plants in Malaysia”
Flyer

11-Aug-2016
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us