Technical Visit to Malaysia’s First Floating Solar System
Venue:
|
Sungai Labu Water Treatment Plant, Sepang, Selangor
|
Date & Time:
|
18 Aug 2016 (9:00 AM - 2:00 PM)
|
CPD: |
3 |
Closing Date Before: |
15-Aug-2016 (Subject to change based on availability of seat) |
Organised By |
Graduates & Student - The Young Engineers Section (YES) |
Synopsis
One of the major challenges in large scale solar farm is securing the land of sufficient size. TNB Research (wholly owned subsidiary of Tenaga Nasional Berhad) together with Ministry of Energy, Green Technology and Water has embarked on 100kWp pilot floating solar system in Sg. Labu Water Treatment Plant in Sepang, Selangor. The aim of this technical visit is to learn the issues and challenges of implementing floating solar farm in Malaysia.
Tentative Itinerary
Time Programme 08:30 am Registration at IEM 09:00 am Depart to Sungai Labu Water Treatment Plant 10:00 am Arrival, Briefing Session & Visit to Floating Solar Farm 12.30 pm Visit ended and depart to IEM 2.00 pm Expected arrival at IEM
NOTE: The visit is strictly limited to only 30 participants registered on a “first-come first-served” basis.
|
|