Past Event

Technical Visit to SULRT3 Light Rail Transit Line 3 Underground (UG) Section
Venue: LRT3 UG Section VES and TPSS (near Bulatan Kayangan)
Date & Time: 17 Jan 2024 (8:00 AM - 12:30 PM) Closed
CPD: 3
Closing Date Before: 14-Jan-2024 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

Underground tunnel construction is a strategic choice aimed at conserving land resources, preventing traffic and utility disruptions, and minimizing adverse effects on the local community for many countries including Malaysia. Tunnel Boring Machines (TBMs) are employed to excavate tunnels and establishing the underground network based on risk assessment and geological analysis. LRT3 UG package has given a chance to many local talents to be trained and pursued their career as a specialist builder in engineering profession.

This technical visit will give a better understanding and visualization to all participants on the tunnel construction activity especially on the construction method, tunnel lining segment, cross passage, first stage concrete, plinth construction, rail installation, M&E equipment, utilities, etc. This walk will cover roughly 2.2km distance (return) from the tunnel portal to ventilation escape shaft (VES).


Note :
SAFETY REMINDER : Participants shall be well-equipped with their own PPE equipment, i.e. safety helmet, safety vest and safety boots in order to be allowed access into the site.

Goggle Map : https://maps.app.goo.gl/4i9d8sLfoN4xZxzy6 (for info)
Transport      : Transportation provided (please arrive before transport depart from IEM)

Note :
• Participants is requested to have their own breakfast before the visit as no refreshment shall be provided at site due to ‘site space constraint’.
• The visit is strictly limited to 20 participants registered on a first-come, first-served basis or once the visit reaches its limit number of participants. No additional participants or late registration shall be entertained.


Additional Information
Posted on
 
 
Technical Visit to SULRT3 Light Rail Transit Line 3 Underground (UG) Section
Flyer

06-Dec-2023
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 47.17 47.17
HONORARY FELLOW 47.17 47.17
FELLOW 47.17 47.17
DISTINGUISHED MEMBER 47.17 47.17
SENIOR MEMBER 47.17 47.17
MEMBER 47.17 47.17
HONORARY MEMBER 47.17 47.17
SENIOR GRADUATE 47.17 47.17
GRADUATE 47.17 47.17
INCORPORATED MEMBER 47.17 47.17
AFFILIATE 47.17 47.17
ASSOCIATE MEMBER 47.17 47.17
ENGINEERING TECHNOLOGIST GRADUATE 47.17 47.17
ENGINEERING TECHNICIAN GRADUATE 47.17 47.17
ENGINEERING TECHNOLOGIST MEMBER 47.17 47.17
ENGINEERING TECHNICIAN MEMBER 47.17 47.17
STUDENT 47.17 47.17
Non IEM Member 66.04 66.04

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us