Webinar Talk on “Tunnel Dismantling Machine - from Innovation to Completion”
Venue: Digital Platform
Date & Time: 21 Dec 2023 (3:00 PM - 5:05 PM) Closed
CPD: 2
Closing Date Before: 18-Dec-2023 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

The MTR West Island Line is an extension of the existing MTR Island Line (ISL) of Hong Kong Island. The project involved the demolition and backfilling of 132 m of an existing Overrun Tunnel through complex geology beneath a densely-populated urban area in order to enable the subsequent excavation of the new running tunnel. The underground demolition works were completed using a bespoke tunnel dismantling machine (TDM). The TDM was assembled inside the existing tunnel and worked backwards to remove each ring of lining segments under 2.8 bar compressed air pressure, placing a sprayed concrete lining for temporary support and backfill of the remaining void left underground. This presentation will explain the TDM’s design, development, assembly and operation to complete the works and allow the realigned running tunnel to be completed successfully.


BIODATA OF SPEAKER

Mr SALISBURY Christopher David (B.Eng., FHKIE, RPE)

36 years post qualification experience in tunnel and heavy civil engineering design, construction and project management. Other experience includes design and construction of heavy civil infrastructure including stations, industrial buildings, deep basements, caverns, earth retaining structures and airport Infrastructure; Experience in the field of tunnel boring machine (TBM) design and manufacture and business administration. David is familiar with all international forms of contract and has specialised throughout his career in Target Cost and more recently NEC4 forms of contract. Certified NEC Professional a Fellow of the Hong Kong Institution of Engineers. He is currently an independent consultant specialising in consulting and risk management for tunnelling and major infrastructure works.

David is the secretary of the Hong Kong Tunnelling Society organizing meetings and lectures for over 15 years, he also helped organise two highly successful IMMM Tunnelling Conferences in Hong Kong in 2009 and 2015. He has sat on a number of committees and professional bodies related to the construction industry in Asia. He was the key author of the Hong Kong Geotechnical Engineering Office Report 298 “Ground Control for EPB TBM Tunnelling” published in 2014 and has been the author or co-author of over 20 technical publications.


Limited to 870 participants only (first come basis) and confirmation email will be sent for successful registration latest by 20 December 2023 @ 5.00 PM


Additional Information
Posted on
 
 
Webinar Talk on “Tunnel Dismantling Machine - from Innovation to Completion”
Flyer

19-Dec-2023
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
ENGINEERING TECHNOLOGIST GRADUATE 18.87 14.15
ENGINEERING TECHNICIAN GRADUATE 18.87 14.15
ENGINEERING TECHNOLOGIST MEMBER 18.87 14.15
ENGINEERING TECHNICIAN MEMBER 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us