Past Event

Technical Visit to MRT Underground Site - Conlay Station
Venue: Conlay MRT Station construction site
Date & Time: 19 Sep 2019 (10:00 AM - 4:00 PM) Closed
CPD: 2
Closing Date Before: 16-Sep-2019 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering AND Geotechnical Engineering

Transport : Coach will be provided. Participants are to assemble at 10.00 am at Bangunan Ingenieur, Petaling Jaya. The coach will depart IEM at 10.30 am sharp.

PROJECT BRIEF
The Klang Valley Mass Rapid Transit (KVMRT) Project is a rail-based public transport network, envisaged to radically improve and transform Kuala Lumpur’s public transportation coverage and to propel the Greater Kuala Lumpur region into one of the top most liveable cities in the world. The second MRT Line, i.e. the Sungai Buloh-Serdang-Putrajaya (SSP) Line will serve a corridor with a population density of around 3 million people stretching from Sungai Buloh to Putrajaya, covering Sri Damansara, Kepong, Batu, Jalan Sultan Azlan Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya. The 52.2km alignment, including13.5km of underground tunnels, will have a total of 36 stations, 11 of which will be built underground.

The technical visit aims to allow the participants to develop a greater understanding on the deep excavation in karstic limestone. Conlay Station, involves a 29 m deep excavation, and is located at the geological interface between the Kenny Hill Formation and the Kuala Lumpur Limestone Formation.  The deep excavation will be viewed from the viewing platform at the ground surface.  A technical briefing will also be conducted.


PRICE EXCLUDES
1. Travel insurance.
2. Items not mentioned herein such as extra expenses incurred due to disruption of travel plan,
    deportation, refusal entry, sickness, death, riot, act of nature, rumours, war, and diseases.
3. Personal protective equipment.


NOTE:
• The visit is strictly limited to 20 participants registered on a first-come, first-served basis.
• Please observe the NO Photography Allowed policy at MRT construction sites.


Additional Information
Posted on
 
 
Technical Visit to MRT Underground Site - Conlay Station
Flyer

05-Sep-2019
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 47.17 47.17
HONORARY FELLOW 47.17 47.17
FELLOW 47.17 47.17
DISTINGUISHED MEMBER 47.17 47.17
SENIOR MEMBER 47.17 47.17
MEMBER 47.17 47.17
HONORARY MEMBER 47.17 47.17
SENIOR GRADUATE 47.17 47.17
GRADUATE 47.17 47.17
INCORPORATED MEMBER 47.17 47.17
AFFILIATE 47.17 47.17
ASSOCIATE MEMBER 47.17 47.17
STUDENT 47.17 47.17
Non IEM Member 75.47 75.47

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us