Past Event

Technical Visit to West Coast Expressway Site at Klang
Venue: WCE Project Site at Klang
Date & Time: 09 Dec 2017 (11:30 AM - 12:30 PM)
CPD: 3.5
Closing Date Before: 06-Dec-2017 (Subject to change based on availability of seat)
Organised By Technical Division - Geotechnical Engineering

BACKGROUND

West Coast Expressway (WCE) is a proposed Toll Expressway of 233 km linking Banting to Changkat Jering, Taiping. It is divided into Selangor and Perak alignment. This provides an alternate road to the existing PLUS North South Expressway. WCE traverses through significant length of soft ground along Selangor alignment where extensive ground treatments are being carried out. At Klang area, about 4km of the alignment is also elevated viaduct with number of pile foundation types covering driven spun piles, bored piles and hand dug caissons.


Note:
- The visit is strictly limited to the first 25 participants registered on a first-come-first-served basis.
- The participants are required to bring their own safety helmets, safety vests and safety shoes.


Additional Information
Posted on
 
 
Technical Visit to West Coast Expressway Site at Klang
Flyer

23-Nov-2017
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 47.17 47.17
HONORARY FELLOW 47.17 47.17
FELLOW 47.17 47.17
DISTINGUISHED MEMBER 47.17 47.17
SENIOR MEMBER 47.17 47.17
MEMBER 47.17 47.17
HONORARY MEMBER 47.17 47.17
SENIOR GRADUATE 47.17 47.17
GRADUATE 47.17 47.17
INCORPORATED MEMBER 47.17 47.17
AFFILIATE 47.17 47.17
ASSOCIATE MEMBER 47.17 47.17
STUDENT 47.17 47.17
Non IEM Member 75.47 75.47

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us