Download Details
Updated on: |
11-May-2017
|
Title: |
Pre AGM Talk on Framework of Supervision and Risk Mitigation Measures in Construction of Major Underground Rail Infrastructure Projects – The Singapore Way and Challenges And Potential Disputes In Tunneling
|
Description: |
Flyer
|
Download Details: |
Download Link: |
Download
|
File Size |
578K |
Total Downloads: |
561 |
|
Advertisement
|
|