Close Window
|
Membership No: |
| 49333 |
|
|
|
Full Name: |
CHUA TECK LIANG
|
|
Preferred Name: |
CHUA TECK LIANG
|
|
Grade: |
MEMBER
|
|
Discipline: |
CIVIL
|
|
Sub Discipline: |
-
|
|
Date of Council: |
15-Jul-2024
|
|
State: |
SELANGOR
|
|
Office Phone No: |
Privacy protected
|
|
Mobile /Hand Phone No: |
0168435125
|
|
House Phone No: |
Privacy protected
|
|
Oversea Phone No: |
Privacy protected
|
|
Fax No: |
Privacy protected
|
|
Email (Personal): |
teckliang0913@gmail.com
|
|
Email (Office): |
Privacy protected
|
|
URL/Homepage: |
Privacy protected
|
| Decoration: |
|
| Other Membership: |
|
| Area of Specialisation: |
SEWERAGE, WASTE WATER
|
| Experience: |
Greater KL Project - Modern Sewerage infrastructure work
D43 - Jinjang Kepong
• Trenchless/micro tunneling method sewerage pipeline works.
• Pipe jacking works monitoring on MTS (Slurry pipe jacking machine) & Sanwa (Auger pipe jacking machine)
• Liaise with sub-contractor to solve site issue (Rescue pit, pit construction issue, etc).
• Liaise with consultant to solve technical issue (Realignment due to site constraint, IL calculation, etc)
• Deal with public complaints.
• Progress report to Project Manager.
D54 - Upper Kerayong (Acting Project Manager)
• Trenchless/micro tunneling method sewerage pipeline works.
• Pipe jacking works monitoring on MTS (Slurry pipe jacking machine)
• Liaise with sub-contractor to solve site issue (Rescue pit, pit construction issue, etc).
• Liaise with consultant to solve technical issue (Realignment due to site constraint, IL calculation, etc)
• Attending progress meeting.
UK1&3 D54 Effluent Pipeline (Acting Project Manager)
• Trenchless/micro tunneling method sewerage pipeline works.
• Pipe jacking works monitoring on MTS (Slurry pipe jacking machine)
• Liaise with sub-contractor to solve site issue (Rescue pit, pit construction issue, etc).
• Project planning to meet deadline.
• Attending progress meeting.
Damansara-Shah Alam Highway Package CB1 Sewerage relocation works.
- Jacking/Receiving pit construction.
- Pipe jacking works. 900mm/600mm/525mm/225mm RCJP installation.
- Permanent manhole construction works.
- Pipe connection to existing manhole.
- Pipe testing and handover (PDC7).
- Work program monitoring.
- Monthly progress claim.
- Existing sewerage repairing works.
- TBM maintenance and modification. |
Note (Area of Specialisation and Experience)
IEM makes no representation or warranties of any kind, expressed or implied, about the completeness, accuracy or reliability with respect to the information provided by the member.
Close Window
|