Technical Visit to “GAMUDA IBS, BANTING”
Venue:
|
GAMUDA Industrial Building System, No 1, Persiaran Graphite Kawasan Perindustrian Bandar Mahkota Banting, 42700 Banting Selangor Darul Ehsan.
|
Date & Time:
|
08 Sep 2022 (8:45 AM - 12:30 PM)
Closed
|
CPD: |
2 |
Closing Date Before: |
05-Sep-2022 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Civil and Structural Engineering |
SYNOPSIS
Gamuda Industrial Building System (Gamuda IBS) Gamuda IBS Banting, is Gamuda’s second IBS factory on a 27 ha-site. The first Gamuda IBS factory is in Sepang on a 11 ha-site.
The Banting factory makes solid walls, double walls, pre-stressed half slabs, prefabricated bathroom pods and special façade elements. Gamuda claimed that the precast double walls enable the developer to build all the way up to 50 floors.
The Banting factory can make about 7,000 units of housing every year, while Sepang factory make 3,000 units a year. This gives Gamuda IBS a total output capacity of 10,000 units of housing per year.
The BIM design data is on a platform that is accessible to all parties such as architects, structural engineers and electrical engineers. In the factory, an army of robots and machinery, are doing the cutting, welding, concrete batching, concrete pouring and other functions. Concrete casting is done indoors with the product receiving curing or hardening under climate-controlled curing chambers to achieve proper strength and smooth finish consistently.
NOTE:
- For your safety, we would advise the following attire to be observed: • Gentlemen: Shoes, long pants and at least, collared t-shirt. • Ladies: Closed-toe and low-heel shoes, long pants, and short- or long-sleeved tops. - Participants are refrain from taking photographs and videos in the factory - The visit is strictly limited to 30 PARTICIPANTS registered on a first-come, first-served basis.
|
|