SYNOPSIS
This Webinar will formally introduces AC Railway Scheme and DC Railway Scheme as practised/ operated in Malaysia's modern electrified railway transportation infrastructure. To appreciate/differentiate the railway systems that utilize both Rotary Induction Motor Propulsion System and Linear Induction Motor Propulsion System for existing LRT/MRT Urban Transit Lines of 750V DC Railway Scheme, and 25kV AC Railway Scheme for KTMB and KLIA ERL Mainline Railway operation
BIODATA OF SPEAKER
Ir. Dr Amir Basha Graduated with B.Sc. (Eng) 1st Class Hons, from University of London King's College in 1974, and M.Sc. and Ph.D in Power Systems from University of Manchester in 1976 and 1979 respectively. Served LLN/TNB for 33 years (1974- 2007) and was one of those several local pioneer engineers who were involved in the planning, design, implementation and operation of the 500kV/275kV/132kV National Power System Grid, holding positions of Senior Engineer and Chief Engineer in the Development Planning and System Operation Divisions. He was principally involved in the setting up of UNITEN and TNB Research (full subsidiaries of TNB) in the mid-1990s, as the First (Founding) Dean College of Engineering UNITEN and Managing Director of TNB Research, respectively before his retirement in 2007. Since then, he has been with Minconsult leading/assisting teams involved in power system projects, such as power generating plants, electric traction rail projects (LRT/MRT, KTMB and High Speed Rail (HSR), Solar PV projects, Management & Engineering Audits of the ESI, and formulation of Feasibility Study Reports/Master Plan Study Reports related to Electricity/Energy Planning. A BEM registered Professional Engineer Practicing Certificate and ASEAN Chartered Professional Engineer, Corporate Member of IEM and Alumni Harvard Business School Senior Management Program.
Mohd Syazwan bin Sulaiman was graduated from University of New Brunswick (2012, Canada) in Electrical Engineering (Power System). He started his career in Minconsult Sdn Bhd and his first rail project was Kelana Jaya Extension Line (KLJ) Project. He was involved in both design and site office experience as Project Engineer and Assistant Resident Engineer respectively. Since 2017, he was involved in various rail projects such as LRT3, KL-SG HSR, and several high level railway studies. In KL-SG HSR (TAC Project), he had an opportunity to model and run the operation simulation of KL-SG HSR using OpenTrack software. He is currently working in LRT3 project as a system interface and electrical engineer for LV system.
Limited to 470 participants only (first come basis) and confirmation email will be sent for successful registration latest by 09 December 2020 @ 5.00 PM
|