Past Event

Technical Talk On “Non Metallic Pipeline for Offshore Pipeline and Riser Application”
Venue: Wisma IEM
Date & Time: 26 Aug 2020 (5:30 PM - 7:30 PM) Closed
CPD: 2
Closing Date Before: 23-Aug-2020 (Subject to change based on availability of seat)
Organised By Technical Division - Oil, Gas and Mining

SYNOPSIS

Non-metallic pipe (NMP) is recently getting increased popularity as material for onshore and offshore pipeline, and slowly replace conventional carbon steel (CS) material. Even though the material is generally more expensive than conventional carbon steel, the total life cycle cost (TLCC) reduction is driven by reduction of pipeline installation cost, especially for offshore pipeline and riser application,  (faster lay rate, less manpower/equipment) and operational cost (no chemical injection to combat corrosion, less operational pigging and inspection).

There are various non-metallic materials available in the market. Not many materials are suitable or applicable for oil & gas application. The most common types of spoolable NMP currently used are reinforced thermoplastic pipe (RTP) and thermoplastic composite pipe (TCP).

This sharing session is intended to improve industry awareness, understanding and knowledge on technical capability and limitation of non-metallic pipe, especially spoolable RTP and TCP material, for offshore pipeline and riser application. It will also discuss current available standard and development in the non-metallic standard to increase reliability, integrity and safety for the non-metallic application in oil and gas.  


SPEAKER BIODATA

I Wayan Eka Putra has nineteen years’ experience in consultant, contractors and oil & gas operating company, covers engineering design, procurement, construction/fabrication, operation, inspection, maintenance repair and rehabilitation for oil and gas pipelines.

He is currently a Staff (Specialized) Pipeline Engineer, Offshore Design, in Group Technical Solutions (GTS) PETRONAS, appointed as Technical Authority for Pipeline Projects within PETRONAS, Malaysian and international operation, including Joint Ventures (JV). In addition, he is also Discipline Resource Person (DRP) for Offshore Pipeline and Geotechnical Skill Group, regular trainer at Institute Technology PETRONAS (INSTEP) for conducting various Level 1 & 2 Pipeline Engineering Skill Group trainings. He is also responsible to update or develop new for PETRONAS Technical Standards (PTS), PETRONAS Technical Guideline (PTG), and in-house engineering pipeline engineering software. He is key person for qualification, and development of new technology for pipeline in PETRONAS.

Tg M Shahru Haslan B Tn Yusoff has ten years’ experience in design and installation/ construction of offshore and onshore pipelines in both domestic and international projects. He is Senior Pipeline Engineer (Offshore Design) in Group Technical Solutions (GTS) PETRONAS. In 2017, he was a Project Team Leader who execute engineering, procurement, installation, pre-commissioning and commissioning for NMP Pilot Demonstration Project which was piloting NMP 1st application in PETRONAS. He is currently been assigned to Petronas Carigali (International) Holding B.V (PCIHBV) based in Garraf, Iraq since 2019.


NOTE
- Strictly Registration and Payment via IEM Online Only
- No Walk-In Allowed
- Limited To  65 Seats Only. ‘First-Come-First-Registration Basis’


Additional Information
Posted on
 
 
Technical Talk On “Non Metallic Pipeline for Offshore Pipeline and Riser Application”
Flyer

24-Jul-2020
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us