Technical Visit To Biogas Power Plant in Ulu Kanchung Palm Oil Mill (Rescheduled to 12 September 2019, Thursday)
Venue:
|
Ulu Kanchung Palm oil mill, 71209, Rantau, Negeri Sembilan
|
Date & Time:
|
21 Sep 2019 (8:00 AM - 1:00 PM)
Closed
|
CPD: |
3.5 |
Closing Date Before: |
18-Sep-2019 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Agricultural and Food Engineering |
SYNOPSIS
Under the National Key Economic Areas (NKEA) plan by the Government in the 10th Malaysia Plan (2010-20l5), the importance of biogas trapping is evident from its inclusion as one of the Eight Entry Point Projects (EPPs) of the palm oil sector. The Biogas capturing project from the Palm Oil Mill Effluent (POME) is a good source of renewable energy for various utilization and application. The biogas power Plant In Ulu Kanchung Palm Oil Mill is a green energy power plant integrated with a palm oil mill having high processing capacity per hour and per annum. The biogas plant is able to provide gaseous that can generate more than 1.5MW continuously in general condition. Hence green energy is generated from the plant which is very environmental friendly. It can contribute to the company in revenue generation. Undeniably it can be a good reference and example for mutual industry players.
NOTE
The visit is strictly limited to only thirty (30) participants registered and fully paid on a first-come, first-served basis
|
|