Past Event

Technical Visit to Pipe-Roofing Tunnelling at Sg. Bunus Pump Gate Station
Venue: Jalan Haji Sirat Kampung Baru, 50300 Kuala Lumpur
Date & Time: 26 Jan 2019 (8:00 AM - 1:30 PM) Closed
CPD: 3
Closing Date Before: 23-Jan-2019 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

Organised by
Tunnelling & Underground Space Technical Division, IEM


SYNOPSIS

As part of Rancangan Tebatan Banjir Sg. Bunus, Wilayah Persekutuan Kuala Lumpur, the Department of Irrigation and Drainage (DID), Wilayah Persekutuan has implemented a project to mitigate flooding issues in the Sg. Bunus catchment area. The main objectives of the project are to protect lives; safeguard the health and safety of residents in the community; reduce damages to structures due to flooding; and to ensure a sustainable future for the community. Both soft-engineered features and structural measures have been considered in the project, which include storage ponds, in-stream storage, planting of vegetations, tunneling, underground storage tanks and pumping stations.

A twin box culvert would act as a vital connection between Sg. Bunus and Sg. Klang acting as a control-gate structure that hoist force main drainage pumping system that lifts low water level from Sg. Bunus to high water level of Sg Klang.

In order to construct a cast-in-situ twin box RC tunnel (serving later as a pump gate drainage culvert) within the existing Reinforced Earth (RE) wall road ramp, a temporary pipe-roofing system (Microtunelling) is introduced.

The first of its kind in the world pipe-roofing tunneling system through RE wall road ramp has been designed for the above purpose. The system encompasses the insertion of a series of horizontal contiguous steel pipes (600mm dia.) at shallow depth beneath and through the existing highway RE wall road ramp by hydraulic steel pipe jacking, including jacking in the vertical directions.

Stability Enhancement Measures  

1. Prior to the advancing steel pipes, a Cement-Bentonite mixture slurry would be grouted into the RE wall granular material of the ramp to solidify it as well as  to control the loss of the granular material during the pipe jacking operation.  

2. Permeation grout is injected below the RE wall strip foundation to enhance its bearing capacity.

3. Steel tie-rods are introduced in a triangular pattern which are inserted and tightened horizontally to ensemble and sandwich both faces of the RE wall panels to enhance the ramp stability against the pipe jacking forces, and both the RE wall panel faces are then covered with reinforced concrete gunite.  

4. The abovementioned technique provides measures to control ground movements during pipe jacking. This is so that the settlements of both overlying and road pavement as well as the movement of RE wall panels are minimised and maintained within the acceptable limits, otherwise this would cause disturbance to the live traffic. And for that purpose, two types of monitoring systems are implemented, i.e. Automatic Total Station (ATS) & Terrestrial Laser Scanning (TLS) which have been counterchecked by precise manual levelling monitoring survey.

SAFETY REMINDER:
Participants shall be well-equipped with their own PPE equipment, i.e. safety helmet, safety vest and safety boots in order to be allowed access into the site.

NOTE:
• The visit is strictly limited to 30 participants registered on a first-come, first-served basis


Additional Information
Posted on
 
 
Technical Visit to Pipe-Roofing Tunnelling at Sg. Bunus Pump Gate Station
Flyer

04-Jan-2019
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 50.00 50.00
HONORARY FELLOW 50.00 50.00
FELLOW 50.00 50.00
DISTINGUISHED MEMBER 50.00 50.00
SENIOR MEMBER 50.00 50.00
MEMBER 50.00 50.00
HONORARY MEMBER 50.00 50.00
SENIOR GRADUATE 50.00 50.00
GRADUATE 50.00 50.00
INCORPORATED MEMBER 50.00 50.00
AFFILIATE 50.00 50.00
ASSOCIATE MEMBER 50.00 50.00
STUDENT 50.00 50.00
Non IEM Member 80.00 80.00

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us