IEM Southern Branch Event


Title : Half-Day Technical Visit to MRT Project
Date : 2nd September 2016 (Friday)
Venue No. 52 Jalan SS21/1, Damansara Utama, Selangor
Participants are to assemble at MRT Information Centre @ 9.00 a.m. (Own transport)
Attire Smart casual, Safety helmets and safety boots are not required

Synopsis:

The Klang Valley Mass Rapid Transit (KVMRT) System is set to be one of the most important and largest transport infrastructure projects Malaysia has embarked on. This project is listed as an Entry Point Project (EPP) under the Economic Transformation Programme’s Greater Kuala Lumpur/Klang Valley National Key Economic Areas (NKEA), and will provide a major boost in the integration and efficiency of urban public transport. The KVMRT project will see the construction of three MRT lines; MRT Line 1, MRT Line 2 and MRT Line 3.

The MRT Line 1 begins from Sungai Buloh and runs through the city centre of Kuala Lumpur before ending in Kajang, spanning 51 km with a total of 31 stations along its route. It will feature both elevated and underground stations and is expected to run at a frequency of 3.5 minutes.

The Government has allocated RM28 billion for the implementation of the MRT Line 2 for the Sungai Buloh-Serdang-Putrajaya link. The MRT Line 2 will serve a corridor with a population of around 2 million stretching from Sungai Buloh via Central Business District of Kuala Lumpur to Bandar Malaysia, Kuchai Lama and Serdang before ending at Putrajaya. The 52.2km line will include a 13.5km underground section between Jalan Ipoh and Kuchai Lama and 38.7km of viaduct. There will be 37 stations, 26 of which will be elevated with 11 underground stations. The stations will include Sri Damansara, Kepong, Kampung Batu, Jalan Sultan Azlan Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya.
Objective of this Technical Visit is to get some insight on the implementation of the project as well as knowledge sharing in the planning, design and execution of the project especially for our young engineers.

The details of the proposed Technical Visit is listed as follows:-                                   

Time

Itinerary of the visit (Tentative)

9.00 am

Arrival of Guests at MRT Information Centre, Damansara Utama, Selangor.

9.15 am – 10.45 am

MRT Project Overview presentation by MMC Gamuda.

10.45 am –11.15 am

Question & Answer Session.

11.15 am – 12.00 pm

Tour to MRT Information Centre

12.00 pm

Technical Visit Ends


The visit is strictly limited to 40 participants only. 

BEM Approved CPD HOURS: 3

For more info, kindly download attached documents.


Additional Information
Posted on
 
 
Half-Day Technical Visit to MRT Project
Map

25-Aug-2016
Download
Post Comment
Half-Day Technical Visit to MRT Project
Flyer

25-Aug-2016
Download
Post Comment
 

Advertisement

Close Window