Past Event

Talk on “Typical Changes Leading to Cost Overruns, Delays and Claims in Infrastructure, Oil and Gas Projects”
Venue: Wisma IEM, 04- TUSTD Lecture Room, 2nd Floor, 03- CSETD Lecture Room, 2nd Floor
Date & Time: 07 Apr 2016 (5:30 PM - 7:30 PM)
CPD: 2
Closing Date Before: 04-Apr-2016 (Subject to change based on availability of seat)
Organised By Technical Division - Oil, Gas and Mining

SYNOPSIS

Due to the complexity of infrastructure, oil and gas projects, various changes would inevitably lead to cost overruns and delays to the projects which poses significant challenge to both Client and Contractor in managing the expectation and resolution with respect to relief, cost and time impacts. Whilst change is unavoidable, the ability for the contracting parties to prepare themselves early in the project will reduce or attempt to avoid disputes is a critical success factor for the project, particularly relating to timely notice issuance, availability and keeping track of information, good record keeping and allocation of dedicated resources for contract management.

This talk is intended to provide participants with a brief awareness of key typical issues relating to changes in infrastructure/oil and gas contracts, to be able to:

 Pro-active in setting up process to manage changes in the project;
 Appreciate the need for good record keeping;
 Set up framework for collection of factual data;
 Avoid claims being barred;
 Know when to issue notices and what information to be included;
 Take early action to maintain control; and
 Avoid or minimize disputes through proper contract administration.

BIODATA OF SPEAKER

Mr. Kumar Arumugam graduated from Universiti Teknologi Malaysia in 2000 with Bachelor of Electrical Engineering (1st Class Hons). He has over 16 years industry experience; having specialized in tendering, contract management, claims and claims avoidance for the last 10 years. Kumar specializes in contract management and contractual claims and has been involved in the preparation and defense of claims on behalf of both clients and Contractors in commercial negotiation and disputes, including preparation and presentation of contracts and claims strategy to client’s senior management. Kumar has extensive experience in building, infrastructure, and oil & gas projects.


Additional Information
Posted on
 
 
Talk on “Typical Changes Leading to Cost Overruns, Delays and Claims in Infrastructure, Oil and Gas Projects”
Flyer

03-Mar-2016
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us