TECHNICAL VISIT KTM DOUBLE TRACK FROM SUBANG TO SKY PARK
Venue:
|
Ikhmas Jaya Office, No. 35, 37, &39, Jalan PJU 1A/41B, Pusat Daganan NZX, Ara Jaya, 47301 Petaling Jaya, Selangor.
|
Date & Time:
|
06 Oct 2015 (9:00 AM - 1:00 PM)
Closed
|
CPD: |
3 |
Closing Date Before: |
03-Oct-2015 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Highway and Transportation Engineering (HTETD) |
SYNOPSIS
The proposed Projek Landasan Keretapi Dari Subang Kr Terminal Subang Fasa 1 involves the construction of the elevated guideway from a location (CH 4090) behind Sime Darby Hospital to the Subang Skypark (CH 8157). This method statement covers the work that is necessary fo the completion of the proposed elevated guideway. The total length of the proposed guideway under this project is approximately 4.067 Km. The work under this elevated guideway package include
• Shortt span – T-Beam (<30M) from Pier 8 – P12, P15-P61, P64-P99 and P107-P113 • Medium Span – Insitu Post-Tensioned Box Girder (50M-50M-50M-40M-40M) from P102-P105, P105-P107 • Special Crossing 1 – Balance Centilever (90M-150M-90M) from P99-P102 • Special Crossing 2 – Balance Centilever (70M-120M-70M) from P1 – P4 • Special Crossing 3 – Balance Centilever (40M-70M-80M-50M) from P4 – P8 • Special Crossing 4 – Balance Centilever (40M-60M-40M) from P12 – P15 and P61 – P64 • Special Crossing 5 – Balance Centilever (40M-60M-40M) from P61 – P64
|
|