
Training the Trainer updated on 20-May-2013
CIE-HKIE-IEM Tripartite Seminar – Nomination of Malaysian Candidates to Represent Malaysia updated on 14-May-2013
ANNOUNCEMENT OF E-BOOKS PROJECT updated on 09-Apr-2013
IEM DIRECTORY 2012/2013 updated on 15-Mar-2013
Membership Renewal Notice 2013 updated on 14-Jan-2013


Hiking Trail to Gunung Suku (Gunung Suku)
24 May 2013 (08:00:00 AM - 15:00:00 PM)
more details
Talk on Planning & Design of Underground Stations in High Density Urban Environment (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
25 May 2013 (08:30:00 AM - 10:30:00 AM)
more details
13th Annual General Meeting of the Tunnelling & Underground Space Technical Division, IEM (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
25 May 2013 (11:00:00 AM - 13:00:00 PM)
more details
Talk on Analytical, Empirical and Observational Methods for Ground Improvement (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
27 May 2013 (17:30:00 PM - 19:30:00 PM)
more details
Technical Visit to Environmental Sites in Singapore (Singapore)
27 May 2013 to 28 May 2013 (07:00:00 AM - 15:00:00 PM)
more details
Talk on Risk Taking vs Risk Management - a Practitioner’s Perspective (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
29 May 2013 (17:30:00 PM - 19:30:00 PM)
more details
Talk on How Fuel Price Policy Influences Traveler Mode Choice? A Case Study of Klang Valley. (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
30 May 2013 (17:30:00 PM - 19:30:00 PM)
more details
Lecture on Transformation of Geotechnical Practice from Hand Slide Rule to Coupled Flow Computer Analysis - Repeat of The Prestigious 2012 Lumb Lecture (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
03 Jun 2013 (17:30:00 PM - 19:30:00 PM)
more details
One Day Seminar on Protecting System From Lightning and Surge Activity (Sunway Resort Hotel & Spa, Bandar Sunway, Petaling Jaya)
06 Jun 2013 (09:00:00 AM - 17:30:00 PM)
more details
Talk on Controlled Blasting at Construction Sites in Selangor/Wilayah Persekutuan (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
08 Jun 2013 (09:00:00 AM - 11:00:00 AM)
more details
Click here to advertise your banner.
NEWSLETTER
Sign up for our newsletter to receive more information
Name:
Email Address:
|
Hiking Trail To Gunung Irau
|
Venue:
|
Gunung Irau, Cameron Highlands, Pahang
|
|
Date & Time:
|
01 Oct 2011 (8:00 AM - 5:00 PM)
|
| CPD/PDP: |
0 |
| Closing Date Before: |
28-Sep-2011 |
|
Gunung Irau is the 15th highest mountain in Malaysia (2110m). The peak has a border marker shared by 2 states - Pahang and Perak. It is the location for several outdoor scenes from the 2005 Malay blockbuster ‘Puteri Gunung Ledang’. You will need to hike about 4 hours to reach Gunung Irau from the road. The road is famed for being the highest road in Peninsular Malaysia. Mossy forest and fairyland, cold wind and misty clouds are some of the wonders of Gunung Irau.
|
|
| STUDENT |
10.00 |
10.00 |
| GRADUATE |
10.00 |
10.00 |
| ASSOCIATE MEMBER |
10.00 |
10.00 |
| INCORPORATED MEMBER |
10.00 |
10.00 |
| MEMBER |
10.00 |
10.00 |
| FELLOW |
10.00 |
10.00 |
| AFFILIATE |
10.00 |
10.00 |
| Non IEM Member |
10.00 |
10.00 |
| DISTINGUISHED HONORARY FELLOW |
10.00 |
10.00 |
| HONORARY FELLOW |
10.00 |
10.00 |
| HONORARY MEMBER |
10.00 |
10.00 |
|