IEM
Training the Trainer
updated on 20-May-2013


CIE-HKIE-IEM Tripartite Seminar – Nomination of Malaysian Candidates to Represent Malaysia
updated on 14-May-2013


ANNOUNCEMENT OF E-BOOKS PROJECT
updated on 09-Apr-2013


IEM DIRECTORY 2012/2013
updated on 15-Mar-2013


Membership Renewal Notice 2013
updated on 14-Jan-2013



IEM
Hiking Trail to Gunung Suku (Gunung Suku)
24 May 2013 (08:00:00 AM - 15:00:00 PM)
more details

Talk on Planning & Design of Underground Stations in High Density Urban Environment (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
25 May 2013 (08:30:00 AM - 10:30:00 AM)
more details

13th Annual General Meeting of the Tunnelling & Underground Space Technical Division, IEM (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
25 May 2013 (11:00:00 AM - 13:00:00 PM)
more details

Talk on Analytical, Empirical and Observational Methods for Ground Improvement (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
27 May 2013 (17:30:00 PM - 19:30:00 PM)
more details

Technical Visit to Environmental Sites in Singapore (Singapore)
27 May 2013 to 28 May 2013 (07:00:00 AM - 15:00:00 PM)
more details

Talk on Risk Taking vs Risk Management - a Practitioner’s Perspective (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
29 May 2013 (17:30:00 PM - 19:30:00 PM)
more details

Talk on How Fuel Price Policy Influences Traveler Mode Choice? A Case Study of Klang Valley. (Wisma IEM (01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor))
30 May 2013 (17:30:00 PM - 19:30:00 PM)
more details

Lecture on Transformation of Geotechnical Practice from Hand Slide Rule to Coupled Flow Computer Analysis - Repeat of The Prestigious 2012 Lumb Lecture (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
03 Jun 2013 (17:30:00 PM - 19:30:00 PM)
more details

One Day Seminar on Protecting System From Lightning and Surge Activity (Sunway Resort Hotel & Spa, Bandar Sunway, Petaling Jaya)
06 Jun 2013 (09:00:00 AM - 17:30:00 PM)
more details

Talk on Controlled Blasting at Construction Sites in Selangor/Wilayah Persekutuan (Wisma IEM (02- C&S Lecture Room, Second Floor,03- TUS Lecture Room, Second Floor))
08 Jun 2013 (09:00:00 AM - 11:00:00 AM)
more details


Click here to advertise your banner.

IEM

ONLINE SURVEY



NEWSLETTER

Sign up for our newsletter to receive more information
Name:
 

Email Address:
   


Past Event

Hiking Trail To Gunung Irau
Venue: Gunung Irau, Cameron Highlands, Pahang
Date & Time: 01 Oct 2011 (8:00 AM - 5:00 PM)
CPD/PDP: 0
Closing Date Before: 28-Sep-2011

Gunung Irau is the 15th highest mountain in Malaysia (2110m). The peak has a border marker shared by 2 states - Pahang and Perak. It is the location for several outdoor scenes from the 2005 Malay blockbuster ‘Puteri Gunung Ledang’. You will need to hike about 4 hours to reach Gunung Irau from the road. The road is famed for being the highest road in Peninsular Malaysia. Mossy forest and fairyland, cold wind and misty clouds are some of the wonders of Gunung Irau.


Additional Information
Updated on
 
 
Hiking Trail To Gunung Irau
flyer

02-Aug-2011
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
STUDENT 10.00 10.00
GRADUATE 10.00 10.00
ASSOCIATE MEMBER 10.00 10.00
INCORPORATED MEMBER 10.00 10.00
MEMBER 10.00 10.00
FELLOW 10.00 10.00
AFFILIATE 10.00 10.00
Non IEM Member 10.00 10.00
DISTINGUISHED HONORARY FELLOW 10.00 10.00
HONORARY FELLOW 10.00 10.00
HONORARY MEMBER 10.00 10.00

Comment
No data to display
Page 1 of 0 (0 items)
Prev
Next

Comment Area

Please login to add your comment, click here to login