Past Event

Visit to Havys Biogas Plant in Palong, Negeri Sembilan
Venue: Havys Oil Mill Sdn Bhd, KM32, Bahau-Keratong Highway, Bera Pahang, 72100 Bahau, Negeri Sembilan.
Date & Time: 06 Sep 2014 (8:30 AM - 5:30 PM) Closed
CPD: 2
Closing Date Before: 03-Sep-2014 (Subject to change based on availability of seat)
Organised By Technical Division - Agricultural and Food Engineering

SYNOPSIS

The technology of biogas plant contributes to CO2 emission reduction, while providing potential energy resources for heating and power generation. A stable functioning biogas plant is necessary for a peace of mind and also guarantees a good investment. An experienced operation team with competent application engineers could provide a full range of services for the establishment of efficient biogas plant which transforms climate change liabilities into a revenue generating asset. Participants will be introduced to the following elements during the visit:

• Project Planning
Project site assessment
Biological input analysis
Profitability analysis

• Project Development and Engineering
Project site survey and permit planning
System design and engineering
Procurement and tendering

• Project Implementation
Project management
Construction and installation
Quality assurance and quality check

• Testing and Commissioning
Technical and biological commissioning
Project closure and audit
Knowledge transfer and training     

• Operation Management
Performance monitoring and optimization
Resources planning and management
Process design and management     

• Other services
Examination of expansion possibilities
Independent project advisory
Project financing support


Key features of Cenergi’s Biogas Plant:
•    Higher alkalinity result in a more robust digester
•    Longer wastewater retention time results in a higher degree of stabilization
•    Lower energy requirement and maintenance cost
•    Sludge are kept in suspension by robust end energy-efficient hydraulic mixers
•    Low methane emission in normal operation with biogas storage
•    High biogas yield
•    COD removal efficiency >90%


Additional Information
Posted on
 
 
Visit to Havys Biogas Plant in Palong, Negeri Sembilan
Flyer

14-Aug-2014
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 50.00 50.00
HONORARY FELLOW 50.00 50.00
FELLOW 50.00 50.00
DISTINGUISHED MEMBER 50.00 50.00
SENIOR MEMBER 50.00 50.00
MEMBER 50.00 50.00
HONORARY MEMBER 50.00 50.00
SENIOR GRADUATE 50.00 50.00
GRADUATE 50.00 50.00
INCORPORATED MEMBER 50.00 50.00
AFFILIATE 50.00 50.00
ASSOCIATE MEMBER 50.00 50.00
STUDENT 50.00 50.00
Non IEM Member 80.00 80.00

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us