Past Event

Technical Visit to Pipe-Roof Supported Tunnel through Existing Highway Embankment Wall
Venue: Jalan Haji Sirat Kampung Baru, 50300 Kuala Lumpur
Date & Time: 28 Sep 2019 (9:30 AM - 1:00 PM)
CPD: 3
Closing Date Before: 25-Sep-2019 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

As part of Rancangan Tebatan Banjir Sg. Bunus, Wilayah Persekutuan Kuala Lumpur, the Department of Irrigation and Drainage (DID), Wilayah Persekutuan has implemented a project to mitigate flooding issues in the Sg. Bunus catchment area. The main objectives of the project are to protect lives; safeguard the health and safety of residents in the community; reduce damages to structures due to flooding; and to ensure a sustainable future for the community. Both soft-engineered features and structural measures have been considered in the project, which include storage ponds, in-stream storage, planting of vegetations, tunneling, underground storage tanks and pumping stations.

A twin box culvert would act as a vital connection between Sg. Bunus and Sg. Klang acting as a control-gate structure that hoist force main drainage pumping system that lifts low water level from Sg. Bunus to high water level of Sg Klang.

In order to construct a cast-in-situ twin box RC tunnel (serving later as a pump gate drainage culvert) within the existing Reinforced Soil (RS) wall highway embankment, a temporary pipe-roofing system (Microtunelling) is introduced for tunnel excavation.

The first of its kind in the world pipe-roof support tunneling through RS wall embankment has been designed for the above purpose. The system encompasses the insertion of a series of horizontal contiguous steel pipes (600mm dia.) at shallow depth beneath and through the existing highway RS wall embankment by hydraulic steel pipe jacking, including jacking in the vertical directions.


SAFETY REMINDER:
•  Participants shall be well-equipped with their own PPE equipment,
    i.e. safety helmet, safety vest and safety boots in order to be allowed access into the site.


NOTE
• The visit is strictly limited to 30 participants registered on a first-come, first-served basis.


Additional Information
Posted on
 
 
Technical Visit to Pipe-Roof Supported Tunnel through Existing Highway Embankment Wall
Flyer

18-Sep-2019
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 47.17 47.17
HONORARY FELLOW 47.17 47.17
FELLOW 47.17 47.17
DISTINGUISHED MEMBER 47.17 47.17
SENIOR MEMBER 47.17 47.17
MEMBER 47.17 47.17
HONORARY MEMBER 47.17 47.17
SENIOR GRADUATE 47.17 47.17
GRADUATE 47.17 47.17
INCORPORATED MEMBER 47.17 47.17
AFFILIATE 47.17 47.17
ASSOCIATE MEMBER 47.17 47.17
STUDENT 47.17 47.17
Non IEM Member 75.47 75.47

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us