One Day Seminar on “Decoupled Chilled Water System vs. VPF” & “Applied Factory Visit”
Venue:
|
DAIKIN REFRIGERATION MALAYSIA SDN. BHD, 11A, Jalan Utas 15/7, Seksyen 15, 40200 Shah Alam, Selangor
|
Date & Time:
|
08 Aug 2019 (9:00 AM - 3:30 PM)
Closed
|
CPD: |
4 |
Closing Date Before: |
05-Aug-2019 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Building Services |
In Collaboration with : Daikin Applied (Malaysia) Sdn. Bhd.
SYNOPSIS
Chiller plant configuration can be series, parallel, side-stream or hybrid. Primary-secondary system and variable primary system are two commonly designed in chiller plant. This session will introduce the design of primary-secondary and VPF systems. Their Pros and Cons would be discussed. Especially the control and advantages of VPF would be covered
Overall course deliverables shall includes Primary-secondary system and VPF introduction & Variable primary system: advantages and control.
SPEAKER
Dr. Zhao Xi Jing
Specialize in Solution sales engineering, energy audit, measurement and verification, building energy modelling, holistic HVAC energy system
Education PhD, National University of Singapore
Professional Qualification Singapore Certified Energy Manager, Green Mark Facility Professional, LEED AP BD+C, Certified Measurement and Verification Professional
Experience - 2 years in Building & Construction Authority, Singapore Green building assessment and verification, chiller plant energy audit - 2 Years in Johnson Controls, Asia High efficiency plant retrofitting and optimized HVAC controls - 7 years in Trane Air Conditioning, Asia Strategic system energy solutions for applied products, building energy simulation and life cycle economic analysis - 5 years in consultancy, China Specializes in HVAC system design
NOTE
- *Competitors are NOT allowed to join the Seminar & Visit* - Limited To 35 Seats Only. ‘First-Come-First-Registration Basis’ - CLOSING DATE: 01ST AUGUST 2019 OR if the Seminar Reach its Target Registered Participants - NO ONLINE/OFFLINE Registration will be allowed after the Closing Date
|
|