Past Event

Technical Visit to MRT2 Underground Site – Chan Sow Lin Station
Venue: Chan Sow Lin MRT Station construction site
Date & Time: 29 Apr 2019 (8:30 AM - 1:00 PM) Closed
CPD: 3
Closing Date Before: 26-Apr-2019 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

Transport : Coach will be provided. Participants are to assemble at 8.15 am at Bangunan Ingenieur, Petaling Jaya. The coach will depart IEM at 8.30 am sharp.

PROJECT BRIEF

The Klang Valley Mass Rapid Transit (KVMRT) Project is a rail-based public transport network, envisaged to radically improve and transform Kuala Lumpur’s public transportation coverage and to propel the Greater Kuala Lumpur region into one of the top most liveable cities in the world. The second MRT Line, i.e. the Sungai Buloh-Serdang-Putrajaya (SSP) Line will serve a corridor with a population density of around 3 million people stretching from Sungai Buloh to Putrajaya, covering Sri Damansara, Kepong, Batu, Jalan Sultan Azlan Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya. The 52.2km alignment, including 13.5km of underground tunnels, will have a total of 36 stations, 11 of which will be built underground.

The technical visit aims to allow participants to develop a greater exposure on the challenges of underground metro construction in urban built environment in karstic limestone formation. The adopted earth retaining stabilising system as well as engineering innovation to overcome challenges of deep excavation at the karstic limestone site will be the highlight of the technical visit.  

The technical visit includes a technical briefing and walking tour around a viewing platform overlooking a deep excavation.


PRICE EXCLUDES

1. Travel insurance.
2. Items not mentioned herein such as extra expenses incurred due to disruption of travel plan,
    deportation, refusal entry, sickness, death, riot, act of nature, rumours, war, and diseases.
3. Personal protective equipment.


NOTE

•  The visit is strictly limited to 25 participants registered on a first-come, first-served basis.
•  Jointly organised by : Tunnelling & Underground Space Technical Division, IEM
    and Civil & Structural Technical Committee (Geotechnical Division), IES


Additional Information
Posted on
 
 
Technical Visit to MRT2 Underground Site – Chan Sow Lin Station
Flyer

17-Apr-2019
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 47.17 47.17
HONORARY FELLOW 47.17 47.17
FELLOW 47.17 47.17
DISTINGUISHED MEMBER 47.17 47.17
SENIOR MEMBER 47.17 47.17
MEMBER 47.17 47.17
HONORARY MEMBER 47.17 47.17
SENIOR GRADUATE 47.17 47.17
GRADUATE 47.17 47.17
INCORPORATED MEMBER 47.17 47.17
AFFILIATE 47.17 47.17
ASSOCIATE MEMBER 47.17 47.17
STUDENT 47.17 47.17
Non IEM Member 75.47 75.47

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us