Past Event

Technical Visit to Ulu Jelai Hydroelectric Power Station - Rescheduled from 28 October 2018 & 29 October 2018
Venue: Ulu Jelai Hydroelectric Power Station, Cameron Highlands
Date & Time: 18 Mar 2019 (12:45 PM - 5:00 PM) Closed
CPD: 4
Closing Date Before: 15-Mar-2019 (Subject to change based on availability of seat)
Organised By Special Interest Group - Senior

Organised by
Seniors Special Interest Group, IEM

Transport: Coach will be provided. Participants are required to assemble at 7.30 a.m., Wisma IEM, Petaling Jaya.
The coach will depart from IEM at 8.00 a.m. sharp.


PROJECT BRIEF

The project is located in the state of Pahang, in the district of the Cameron Highlands about 140 km north of Kuala Lumpur and 80 km to the west coast of mainland Malaysia. The main features of the project are the Susu Dam – an 88m high Roller Compacted Concrete (RCC) dam on Sg. Bertam, two diversion weirs on Sg.Lemoi and Sg. Telom for the diversion of flows from adjacent catchments via 7.5km and 8.5km long transfer tunnels into Sg. Bertam, to transfer water to Susu  dam,  power  tunnels  and  an underground power house cavern. The installed capacity of the power station is 372 MW with an average annual electrical energy supply of 356 GWh. It also includes the required associated  water  conveyance  and access road system. The hydroelectric power station generates peaking energy to the national grid.


PRICE EXCLUDES

1. Travel insurance.
2. Items not mentioned herein such as extra expenses incurred due to disruption of travel plan, deportation, refusal entry, sickness, death, riot, act of nature, rumours, war, and diseases.
3. All personal incidental such as room services, laundry, beverage and telecommunication bills.
4. Breakfast/Lunch/Dinner
5. Personal protective equipment.

SAFETY REMINDER:
Please be advised that all participants are to adhere to all safety procures, signage and regulation at all time.  TNB will not accept any liability and be held responsible for any accident that may cause bodily injury, death, damages, loss, delay, cost, expenses or any inconvenience arising from this visit.

NOTE
• The visit is strictly limited to 16 participants registered on a first-come, first-served basis.
• For room reservation, kindly contact Secretariat in charge at 03-79684019.


Additional Information
Posted on
 
 
Technical Visit to Ulu Jelai Hydroelectric Power Station - Rescheduled from 28 October 2018 & 29 October 2018
Flyer

21-Feb-2019
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 113.21 113.21
HONORARY FELLOW 113.21 113.21
FELLOW 113.21 113.21
DISTINGUISHED MEMBER 113.21 113.21
SENIOR MEMBER 113.21 113.21
MEMBER 113.21 113.21
HONORARY MEMBER 113.21 113.21
SENIOR GRADUATE 113.21 113.21
GRADUATE 113.21 113.21
INCORPORATED MEMBER 113.21 113.21
AFFILIATE 113.21 113.21
ASSOCIATE MEMBER 113.21 113.21
STUDENT 113.21 113.21
Non IEM Member 188.68 188.68

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us