Past Event

Talk on “Construction of the Longest Cast In-Situ Balanced Cantilever Box Grinder Bridge Supported on Cantilever Crosshead”
Venue: Wisma IEM
Date & Time: 17 Jan 2019 (5:30 PM - 7:30 PM) Closed
CPD/PDP: 2
Closing Date Before: 14-Jan-2019 (Subject to change based on availability of seat)
Organised By Technical Division - Civil and Structural Engineering

Organised by
Civil and Structural Engineering Technical Division, IEM


SYNOPSIS

This 2-hour evening talk will explain the design and construction of the longest prestressed cast in-situ box girder supported on cantilever crosshead (indirect support) built by balanced cantilever construction method at Melaka. The talk will explain the design and detailing as well as the construction of the multiple-span segmental box girder bridge. During the session, it also shows the construction sequence, the typical construction cycle for this cast in-situ box girder construction and the operation of the form travelers. Some of the construction related matter like, temporary fixity system, box girder dimension control; precamber design and Christmas tree as well as the mid-span stitching will be explained.


SPEAKER BIODATA

Ir. LOW HIN FOO graduated from University Malaya with an Honours degree in Civil Engineering.  Since then, he has almost 20 years of experience in the design and construction of various buildings and bridges using reinforced and prestressed concrete, both locally and abroad. He was the Technical Manager for prestressing specialist contractor, BBR Construction Systems, and he is currently the Principal Engineer for a design consultancy firm, OSD Consultants (M) Sdn Bhd.

Ir. Low has involved in the design and construction of few long span prestressed bridges built by balanced cantilever method and he is familiar with the design of integral bridge design. He has vast design experience in the design of prestressed structures for large commercial projects and residential towers with specialist experience in the global lateral analysis of flat slab structures, design of prestressed transfer plate for high-rise towers, and the design of prestressed structure strengthening using CFRP or plat bonding. He is currently working with Monash University Malaysia on research projects on prestressed transfer plate. He is also actively involved in the training of engineers and undergraduates by conducting courses on the design of prestressed building as well as bridge structures.


Additional Information
Posted on
 
 
Talk on “Construction of the Longest Cast In-Situ Balanced Cantilever Box Grinder Bridge Supported on Cantilever Crosshead”
Flyer

28-Dec-2018
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 20.00 15.00
HONORARY FELLOW 20.00 15.00
FELLOW 20.00 15.00
DISTINGUISHED MEMBER 20.00 15.00
SENIOR MEMBER 20.00 15.00
MEMBER 20.00 15.00
HONORARY MEMBER 20.00 15.00
COMPANION 20.00 15.00
GRADUATE 20.00 15.00
INCORPORATED MEMBER 20.00 15.00
AFFILIATE 20.00 15.00
ASSOCIATE MEMBER 20.00 15.00
Non IEM Member 50.00 50.00

Rate stated does not include 6% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 6% SST.


Comment

Box Girder not Box Grinder

From MR. CHEE WENG YAN
on 11-Jan-2019 12:00:51 PM

Page 1 of 1 (1 items)
Prev
[1]
Next

Comment Area

Please login to add your comment, click here to login


Advertisement


Advertisement

Advertisement

Advertisement

Advertisement


Advertisement


NEWSLETTER

Sign up for our newsletter to receive more information
Name:
 
Email Address: