Transport: Coach will be provided. Participants are required to assemble at 7.30 a.m., Wisma IEM, Petaling Jaya. The coach will depart from IEM at 8.00 a.m. sharp.
PROJECT BRIEF
The project is located in the state of Pahang, in the district of the Cameron Highlands about 140 km north of Kuala Lumpur and 80 km to the west coast of mainland Malaysia. The main features of the project are the Susu Dam – an 88m high Roller Compacted Concrete (RCC) dam on Sg. Bertam, two diversion weirs on Sg.Lemoi and Sg. Telom for the diversion of flows from adjacent catchments via 7.5km and 8.5km long transfer tunnels into Sg. Bertam, to transfer water to Susu dam, power tunnels and an underground power house cavern. The installed capacity of 372 MW with an average annual energy supply of 356 GWh. It also includes the required associated water conveyance and access road system. The hydroelectric development generates peaking energy to the national grid.
PRICE EXCLUDES
1. Travel insurance. 2. Items not mentioned herein such as extra expenses incurred due to disruption of travel plan, deportation, refusal entry, sickness, death, riot, act of nature, rumours, war, and diseases. 3. All personal incidental such as room services, laundry, beverage and telecommunication bills. 4. Breakfast/Lunch/Dinner 5. Personal protective equipment.
NOTE
• POSTPONED UNTIL FURTHER NOTICE • The visit is strictly limited to 16 participants registered on a first-come, first-served basis.
SAFETY REMINDER: Please be advised that all participants are to adhere to all safety proceures, sinages and regulation at all time. TNB will not accept any liability and be held responsible for any accident that may cause bodily injury, death, damages, loss, delay, cost, expenses or any inconvenience arising from this visit.
|