Past Event

Technical Visit to KVMRT Line 2 – V207 Mined Tunnel Site
Venue: KVMRT Line 2 – V207 Mined Tunnel
Date & Time: 11 Aug 2018 (8:27 AM - 1:09 PM) Closed
CPD: 3
Closing Date Before: 08-Aug-2018 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS
The MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line is the second of the three planned Klang Valley Mass Rapid Transit (KVMRT) lines to be constructed at the Greater Kuala Lumpur. The approved alignment is 52.2km in length, of which 13.5km is underground primarily within the downtown Kuala Lumpur. A total of 37 stations, 11 of them will be constructed underground. The proposed first section of the southern elevated alignment of KVMRT Line 2 - Southern Kuchai Lama Serdang Alignment (SKSA) interfaces with the underground alignment near the Taman Desa Water Theme Park at Kuchai Lama and ends at the UPM after crossing the MEX Highway where it is connected to the Serdang to Putrajaya Alignment (SEPA).

At one part of SKSA which is going over hilly areas, a 12.1m wide, 10.1m high and 182m long tunnel system is proposed to accommodate the twin-track railway line crossing thru the mountainous terrain comprising Kenny Hill Formation materials of interbedded weak rocks and residual soils. The tunnel will be constructed using New Austrian Tunnelling Method (NATM) with permanent cast in-situ concrete lining. Forepole and friction bolts are selected to support the arch of the top heading around the tunnel crown as well as tunnel walls; this is coupled with steel ribs plus SFR shotcrete as temporary supports for primary lining during the mined tunnelling works.  

This technical visit is aimed to highlight the various aspects and features of the mined tunnelling works on site. It is expected that the mined tunnel has already launched into the ground for considerable lengths from the western portal during the visit.  

SAFETY REMINDER:
Participants to be well equipped with their own safety equipment i.e. safety helmet, safety vest and safety boots in order to gain site access.


NOTE:
• The visit is strictly limited to 30 participants registered on a first-come, first-served basis.


Additional Information
Posted on
 
 
Technical Visit to KVMRT Line 2 – V207 Mined Tunnel Site
Flyer

27-Jul-2018
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 50.00 50.00
HONORARY FELLOW 50.00 50.00
FELLOW 50.00 50.00
DISTINGUISHED MEMBER 50.00 50.00
SENIOR MEMBER 50.00 50.00
MEMBER 50.00 50.00
HONORARY MEMBER 50.00 50.00
SENIOR GRADUATE 50.00 50.00
GRADUATE 50.00 50.00
INCORPORATED MEMBER 50.00 50.00
AFFILIATE 50.00 50.00
ASSOCIATE MEMBER 50.00 50.00
STUDENT 50.00 50.00
Non IEM Member 80.00 80.00

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us