Technical Visit to MRT Operational Control Centre (OCC), MRT Rolling Stock and Maintenance Office (RSMO)
Venue:
|
Depot, MRT SBK Line
|
Date & Time:
|
07 Aug 2018 (8:59 AM - 1:59 PM)
Closed
|
CPD: |
3 |
Closing Date Before: |
04-Aug-2018 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Mechanical Engineering (METD) |
SYNOPSIS
The MRT Sungai Buloh Kajang (SBK) Line connects the commuters from Sungai Buloh (northwest of KL) to Kajang (southeast of KL) through its 51 km route. It comprises of a 41.5 km elevated guideway with 24 stations and 9.5 km tunnel segment with 7 underground stations. The MRT SBK Line also integrates 7 locations / stations with existing rail lines and 16 stations equipped with park & ride facilities. Similar to the LRT, the operations of the MRT SBK Line trains are fully automatic and operated remotely from the Operations Control Centre (OCC) in Sungai Buloh Depot and a Backup Control Centre (BCC) in Kajang Depot. The entire stretches of the MRT SBK Line are fully completed and ready for passengers by July 2017. Starting from 15 December 2016, Phase 1 of the MRT SBK Line will be ready to take the commuters from Sungai Buloh to Semantan, at a total estimated travel time of approximately 30 minutes. All trains will turn back to Sungai Buloh at the north portal near Semantan station. Phase 2 of the line is commencing by July 2017, taking the commuters from Sungai Buloh to Kajang. Estimated traveling time is 86.3 minutes. All trains will be operating at a frequency of 3.3 minutes during peak hours.
Note: The visit is strictly limited to 30 participants registered on a first-come, first-served basis.
|
|