Technical Visit to Construction and Completion of 6 Level Basement Structure for the Proposed Lot 185, 167 and 176 Mixed Development at Persiaran KLCC, Kuala Lumpur
Venue:
|
Lot 185, 167 & 176 Mixed Development at Persiaran KLCC, KL (Next to KLCC Twin Tower)
|
Date & Time:
|
16 Dec 2017 (7:45 AM - 1:45 PM)
Closed
|
CPD: |
4 |
Closing Date Before: |
13-Dec-2017 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Geotechnical Engineering |
SYNOPSIS The proposed Lot 185, 167, 176 mixed development, Kuala Lumpur City Centre (KLCC), will be developed on a land area of 4.231 acres, next to KLCC Twin Tower. The mixed development consists of the 56 and 77-storey towers, 6-storey retail podium and 4-6 level basement car park. Upon completion, this development will have total GFA of 4,959,411 sq. feet. Currently, the semi-top down sub-structure construction and the construction of the tower raft foundation is ongoing.
NOTE: - The visit is strictly limited to 35 participants registered on a “first-come first-served” basis. - All participants must prepare their own PPE (safety helmet + safety vest + safety shoe) with valid CIDB green card.
|
|