Pre-AGM Talk on ‘Precommissioning Inspection and Testing (PIAT) For TNB Substation Buildings’
Venue: Wisma IEM
Date & Time: 11 Aug 2018 (8:59 AM - 10:58 AM) Closed
CPD: 2
Closing Date Before: 08-Aug-2018 (Subject to change based on availability of seat)
Organised By Technical Division - Building Services

SYNOPSIS

The Distribution Division of Tenaga Nasional Berhad has established Pre-Commissioning Inspection and Testing (PIAT) for civil works as a prerequisite in acceptance of substation buildings constructed by TNB appointed contractors as well as by Developers.

Two sets of checklists have been established for the PIAT i.e. checklists for 33 kV projects and 22kV and below projects. The checklists were prepared with reference to the current TNB Distribution specifications for civil works and series of workshops conducted with participants from the Engineering, Asset Development and Operation & Maintenance Units of the Distribution Division.

Specification Compliance Audit (SCA) is conducted at the beginning of every PIAT exercise. The purpose of the SCA is to ensure all relevant documentation, drawings are endorsed and approved by the relevant authorities, work records, product warranties, and O&M Manuals are submitted.  

Details of PIAT checklist includes checking of internal and external components of the substation building. The internal components include Switchgear room, control room, battery room and cable cellar. The external components include bays and plinths for Transformers, Neutral Earthing Resistor (NER), Local Transformer (LT) Capacitor Bank, earthing system, drainage, roadworks, fencing and signage.



SPEAKER BIODATA

Ir. HARPREET SINGH, is a Chief Engineer (Civil) – at the Asset Development Department, Distribution Network, TNB. He is responsible for all project design works related to the construction of substations and transmission lines for 33 kV and below projects. Prior to this position, he was involved in project management of large power plant projects particularly hydropower. He received his first degree in B. Eng (Civil), 1991 from Universiti Teknologi Malaysia. He then obtained a Masters in Engineering Management (MEM) in 2004.


Additional Information
Posted on
 
 
Pre-AGM Talk on ‘Precommissioning Inspection and Testing (PIAT) For TNB Substation Buildings’
Flyer

10-Aug-2018
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 20.00 15.00
HONORARY FELLOW 20.00 15.00
FELLOW 20.00 15.00
DISTINGUISHED MEMBER 20.00 15.00
SENIOR MEMBER 20.00 15.00
MEMBER 20.00 15.00
HONORARY MEMBER 20.00 15.00
SENIOR GRADUATE 20.00 15.00
GRADUATE 20.00 15.00
INCORPORATED MEMBER 20.00 15.00
AFFILIATE 20.00 15.00
ASSOCIATE MEMBER 20.00 15.00
Non IEM Member 50.00 50.00

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us